Catchment Areas – Scenario D Added

Based on public feedback and in consultation with board trustees, we are considering a 4th scenario, which is a variation on scenarios A and C.  It takes into consideration the geography of the northwest quadrant near CM Finch as well as provides another option that keeps the English program at Central.  A final decision will be made by January 29th at the public Board Meeting.

Scenario D – Urban View (PDF)

You can find Scenarios A, B, and C at http://www.prn.bc.ca/?p=3349.

A numerical analysis of all four scenarios is available below.

Changes to catchment areas are required to populate Margaret ‘Ma’ Murray Community School (grades K-6), opening September 2018, as well as to provide space at neighbouring schools.